![]() The front cross member needed to be lowered to accommodate the gearbox. Plates were added for the gearbox mounting and handbrake. Dual brake master cylinders are fitted and a balance bar on the pedal. |
![]() The cross frame, steering box, engine mounting and brake reaction bars are all located into position. |
![]() New leaf springs, posts for the shock absorber top mounting, panhard rod and fuel tank carrier are bolted into place. The rear axle is located with a new set of uprated U-bolts. |
![]() Body tub refitted, scuttle roll baris ready to fit. You can just make out the engine on the hoist, beyond. |
![]() The walnut dashboard is back from being re-veneered and floorboards are cut to size and fitted. |
![]() A new, aluminium gearbox cover is fabricated. |
![]() Then everything is taken off again and the chassis prepaired for paint. |
![]() Looking smart in a new coat of black. |